The Gabar plain beyond the M47 Block, Zagros Basin, Southeast Türkiye
Projects

Oil Exploration Block, S.E. Türkiye

Oil Exploration Block, S.E. Türkiye

Oil Exploration Block, S.E. Türkiye

PROJECT

Cudi-Gabar Oil Petroleum Province, Türkiye

Five years ago, this part of Türkiye produced almost no oil. Today, the Gabar fields around the M47 Block are producing over 83,000 bbl/d¹ from discoveries that didn’t exist a decade ago. Dune Oil has the right to earn a 29% working interest² in the block by funding US$15 million across two work program tranches covering seismic acquisition and drilling.

The block lies about 11 km from the Şehit Aybüke Yalçın field, Türkiye’s largest onshore oil discovery¹, and is surrounded by multiple new TPAO discoveries across the Cudi-Gabar province.

The oil blocks are surrounded by >10 major oil discoveries¹, half of which are recent.

M47

27.6MMbbl

27.6MMbbl

2C contingent, unrisked³

29%

29%

Working interest, right to earn²

450 km²

450 km²

Licence area, M47 Block

US$594M

US$594M

2C NPV10, risked (81% chance of development)⁴

One discovery. Three more targets on trend.

On the same south-dipping carbonate fairway, Bulmuşlar, Şehit Aybüke Yalçın and Esma Çevik are among the TPAO fields producing more than 83,000 bbl/d¹. Dune Oil’s M47 discovery sits on this trend, and three mapped structures follow.

Field names, production and discovery figures on the maps above and below are analogous information (note ¹). Lead volumes are undiscovered oil in place (note ⁶).

Map of the North Leads on Dune Oil's M47 oil block, including the Çetinkaya light oil discovery, Cudi-Gabar province, southeastern Türkiye

Discovery · Çetinkaya

Confirmed light oil · independently evaluated by Chapman³

The anchor of the play. The C-1 light-oil discovery on the M47 structure carries an independent Chapman 2C evaluation, and the Central and Fındık prospects step out from it.

NPV10, unrisked, before tax⁴

US$734M
US$734M

2C contingent, unrisked³

2C contingent, unrisked³

27.6 MMbbl
27.6 MMbbl

Chance of development³

81%
81%

Oil quality⁵

32.4° API light

South Lead 1 · Fındık⁶

Mapped prospect

Mapped structure on the M47 south-dipping carbonate fairway, alongside the discovery. Untested by drilling.

Target depth

1,800 – 2,500 m

Formations

Mardin / Sayındere / Garzan

South Lead 2 · resource pending seismic

A gravity anomaly on the M47 southern boundary. 2026 2D seismic will size the closure and move this into the drilling queue alongside Fındık.

Map of the South Leads exploration targets on the M47 oil block, Cudi-Gabar province, southeastern Türkiye
Map of the Mid Leads exploration targets on the M47 oil block, Cudi-Gabar province, southeastern Türkiye
Map of the Mid Leads exploration targets on the M47 oil block, Cudi-Gabar province, southeastern Türkiye

Mid Lead 1 · Ağaçyurdu Trend⁶

A seismic-mapped structure on the Ağaçyurdu trend

On-trend with Bulmuşlar and Esma Çevik, in a province producing more than 83,000 bbl/d¹.

Formations

Mardin / Sayındere / Garzan

Reservoir

Multi-zone carbonate

Target depth

1,800 – 2,500 m

Adjacent lead

Mid Lead 2 · seismic pending

Mid Lead 2 · Bulmuşlar Trend

Mapped from 2024 gravity and 2D seismic. Untested by drilling.

Work Program

SEISMIC ACQUISITION

Phase 1

  • Earn-in Phase (2026)

  • 2D seismic acquisition on the M47 Block

  • About 40 km over the North discovery area and the South Lead

  • Earn-in Phase (2026)

  • 2D seismic acquisition on the M47 Block

  • About 40 km over the North discovery area and the South Lead

EXPLORATION DRILLING

Phase 2

  • Earn-in Phase (2026-2027)

  • Re-entry of the C-2 well for deepening and testing, a sidetrack or lateral of the C-1 well, and an exploration well on the South Lead, subject to seismic results

  • Earn-in Phase (2026-2027)

  • Re-entry of the C-2 well for deepening and testing, a sidetrack or lateral of the C-1 well, and an exploration well on the South Lead, subject to seismic results

PROPORTIONAL DEVELOPMENT

PROPORTIONAL DEVELOPMENT

Phase 3

  • Post Earn-in

  • All parties bear costs in proportion to their working interest

  • Post Earn-in

  • All parties bear costs in proportion to their working interest

Crude Oil Price (Brent, Europe - USD$)

Crude Oil Price (Brent, Europe - USD$)
Get in touch

Questions about the M47 Block

Investors, analysts, partners and media. Reach the company directly, or subscribe for press releases as they are filed on SEDAR+.

Investors, analysts, partners and media. Reach the company directly, or subscribe for press releases as they are filed on SEDAR+.

By submitting, you agree to our Terms and Privacy Policy.

By submitting, you agree to our Terms and Privacy Policy.

Notes

¹ Neighbouring fields (analogous information). The 83,300 bbl/d record for TPAO’s Gabar fields is from a Türkiye Ministry of Energy and Natural Resources statement of August 6, 2026. Field names, production rates, discovery sizes and distances, including those on the maps, are from TPAO public disclosures and Türkiye Ministry of Energy and Natural Resources statements, as compiled by Dune Oil (January 2026). These sources are independent of Dune Oil. Dune Oil cannot confirm that this information was prepared by a qualified reserves evaluator or in accordance with the COGE Handbook. It is included because those fields produce from the same Cudi-Gabar carbonate trend as Block M47. The fields are operated by TPAO, not Dune Oil, and are not necessarily indicative of resources or production rates that may be achieved at Block M47.

² Working interest. Dune Oil has the right to earn a 29% working interest in Block M47 (licences C3 and C4) under a farm-in agreement. Its interest is subject to completion of the earn-in.

³ North Field contingent resources. 27.6 MMbbl (27,641 MSTB) is the unrisked best-estimate (2C) contingent resource of light crude oil for the North prospect, Mardin Group, Block M47, Cudi-Gabar province, southeastern Türkiye. It is company gross: Dune Oil’s 29% working-interest share before the 12.5% government royalty (24.2 MMbbl, or 24,186 MSTB, after royalty). The estimate was prepared by Chapman Hydrogen and Petroleum Engineering Ltd., Calgary, an independent qualified reserves evaluator (APEGA Permit P004201; responsible member C. W. Chapman, P.Eng.), in accordance with NI 51-101 and the COGE Handbook, effective December 31, 2025, report dated March 27, 2026. It is classified as Economic Contingent Resources, project maturity sub-class Development Unclarified. Chance of discovery 100%, chance of development 81%, chance of commerciality 81%. There is uncertainty that it will be commercially viable to produce any portion of the resources.

⁴ Net present value. NPV10 attributable to the 29% working interest is US$733.5 million unrisked and US$594.2 million risked at the 81% chance of development, before income tax, discounted at 10%, using Chapman’s January 1, 2026 forecast prices. The estimated values do not represent fair market value.

⁵ Oil quality. 32.4° API light oil at the C-1 and C-2 wells, based on log analysis and independent petrophysical evaluation of recovered oil, as reported in the Company’s news release of April 16, 2026.

⁶ Mid and South leads. Mid Lead 1 corresponds to the Central prospect and South Lead 1 to the Fındık prospect in the Chapman evaluation, which estimated prospective resources for both (chance of discovery 38% and 45%; chance of commerciality 31% and 36%). Oil-in-place figures for these leads are undiscovered petroleum initially-in-place, best estimate, unrisked, Dune Oil’s 29% share: Mid Lead 1 47 MMbbl and South Lead 1 28.7 MMbbl. They are not recoverable resources or reserves, and they are not additive to each other or to any other figure. Mid Lead 2 and South Lead 2 have not been evaluated. There is no certainty that any portion of the resources will be discovered. If discovered, there is no certainty that it will be commercially viable to produce any portion of the resources.

Contact Us

Get Press Release Updates

CSE: DUNE - OTC: DUNXF - FSE: Z62

©2026 Dune Oil Corp. Neighbouring-field production: TPAO’s Gabar fields reached a record 83,300 barrels of oil per day (Türkiye Ministry of Energy and Natural Resources statement, August 6, 2026). The source is independent of Dune Oil, which cannot confirm that the information was prepared by a qualified reserves evaluator or in accordance with the COGE Handbook. It is cited because those fields produce from the same Cudi-Gabar carbonate trend as Block M47. Those fields are operated by TPAO, not Dune Oil, and are not necessarily indicative of results at Block M47.

Contact Us

Get Press Release Updates

CSE: DUNE - OTC: DUNXF - FSE: Z62

©2026 Dune Oil Corp. Neighbouring-field production: TPAO’s Gabar fields reached a record 83,300 barrels of oil per day (Türkiye Ministry of Energy and Natural Resources statement, August 6, 2026). The source is independent of Dune Oil, which cannot confirm that the information was prepared by a qualified reserves evaluator or in accordance with the COGE Handbook. It is cited because those fields produce from the same Cudi-Gabar carbonate trend as Block M47. Those fields are operated by TPAO, not Dune Oil, and are not necessarily indicative of results at Block M47.

Oil Exploration & Development in SE Türkiye

Contact Us

Get Press Release Updates

CSE: DUNE - OTC: DUNXF - FSE: Z62

©2026 Dune Oil Corp. Neighbouring-field production: TPAO’s Gabar fields reached a record 83,300 barrels of oil per day (Türkiye Ministry of Energy and Natural Resources statement, August 6, 2026). The source is independent of Dune Oil, which cannot confirm that the information was prepared by a qualified reserves evaluator or in accordance with the COGE Handbook. It is cited because those fields produce from the same Cudi-Gabar carbonate trend as Block M47. Those fields are operated by TPAO, not Dune Oil, and are not necessarily indicative of results at Block M47.